Westleigh lights
Westleigh at night showing the LED lighting we use that can be hooked up to many other lights [...]
Westleigh at night showing the LED lighting we use that can be hooked up to many other lights [...]
Here's another Mosman job started, next door to another we are doing. This will have a spa looking [...]
This Mosman job we started last year but now the house is getting built around it. It has [...]
Formwork and steel going in at Killara, If you look close enough you can see the second pool in the [...]
Lane cove came up an absolute treat, it took a massive effort to get this block down to [...]
This is a project with 2 pools on a development in Killarra. We have 2 10m x 4m [...]
Here Phil and the boys are exposing the interior the timing has to be perfect, to early and [...]
Westleigh tiled and walkway getting done. The walkway on this are railway sleepers cut in half, making them [...]
Here's third generation Zac on the trowel cutting a flow over tank on our pool.
Here's a little beauty in Westleigh getting concerted after Chrissy break. The flow over goes over one length [...]